Tailings Transport System – Cerro Verde Mine

General Information

Client SMCV / Fluor
Location Arequipa, Peru
Date 2014 - 2016

Scope

  • Installation of 60 KM of steel and HDPE pipes for tailings water, tailings dam water recovery and seepage system, installation of cyclones, pumping systems, barges.
  • Massive and localized earthworks, concrete and metallic structure, mechanical assembly and piping, guides, anchor blocks.
  • Electrical, mechanical, instrumentation and control installations.

Project data

11K m3
of concrete
22K m3
of excavations located
133K m3
of embankments
39K m3
of filler.
695K m3
of excavations