EPC of Ilo Thermoelectric Plant (250 MW) EPC
General Information
Client | Engie |
Location | Moquegua, Peru |
Date | 2014 – 2016 |
Scope
- Open cycle thermoelectric plant and expansion of the existing plant.
- ILO31 and ILO21 plant installations.
- Engineering, supply of main and auxiliary equipment, construction, erection, and commissioning.
- 03 Siemens gas turbine generators, 03 exhaust stacks, and 03 synchronous generators with a capacity of 235 MW each.
- Installation of dual turbines (Fuel / Gas).
Project data
19K m3
of filling
1123t
of steel
13K m3
of concrete
141K t
of metal structure
600MW±20%
net power