El Platanal Hydroelectric Power Plant (220 MW) – Surface Work
General Information
Client | Compañía Eléctrica El Platanal - Celepsa |
Location | Lima, Peru |
Date | 2007 – 2009 |
Scope
- Surface works and hydromechanical assembly for the hydroelectric power plant.
- Excavation and support of diversion tunnel: 217 m long with 50 m2 trunk section.
- Temporary bridge (speed bump) to access the exit mouth of the diversion tunnel.
- Construction of two camps.
- Relocation of permanent accesses.
- Jet-Grouting waterproofing curtain.Construction of a 36m high CCR dam.
Project data
4500t
of steel
85M m3
of formwork
79M m3
of concrete
36m
of height of CCR dam