El Platanal Hydroelectric Power Plant (220 MW) – Underground Works
General Information
Client | Compañía Eléctrica El Platanal - Celepsa |
Location | Lima, Peru |
Date | 2010 |
Scope
- Subway works.
- Access tunnel to the exit portal, also in access to the powerhouse.
- Exploratory excavation in dump.
- Camp facilities (offices, dining rooms, change room, workshops). Enclosures with electrical installations, cold water, hot water and sewage.
- Provisional Crossing N°2: 06 pipes of 1200 mm and 12 m long.
Project data
50K m3
of concrete
50K m3
of excavation
4500km
of access
13km
of supply tunnel