Laja Hydroelectric Power Plant (35 MW)
General Information
Client | Engie – AMG Energía |
Location | Region Bio Bio, Chile |
Date | 2009 – 2012 |
Scope
- Civil works, electromechanical assembly, design and construction of the river diversion system, pumping system, earthworks, grouting, anchoring and micropiles, sheet piling.
- Supply and placement of reinforced concrete, metal inserts, slope protection, assembly of radial and flat gates, cranes, generators and turbines.
- Electrical installations.
Project data
3t
of assembly
7t
of steel
91K m3
of concrete