Quitaracsa Hydroelectric Power Plant (112 MW)
General Information
Client | Engie |
Location | Ancash, Peru |
Date | 2010 – 2015 |
Scope
- Civil works, earthworks, and access to the project.
- 02 Pelton turbines, 450,000 m3 dam on the Quitaracsa River with a conduction tunnel of approximately 5 km and a gross fall of 862 m.
- Intake (40m x 25m).
- Desander (90 m in length, 9.30 m x 15 m)
Project data
62K m2
of formwork
190K m3
of concrete
610K m3
of excavations
29mil m3
backfilling and grouting
5t
Reinforcing steel